Posted in jenga

Jenga 5.0

On the next iteration of our Jenga project, our group “Interlocking” was paired with another group of three named “Circuit”.  Together, we named our group “Pinnacle” and based our idea on stacking of structures and twisting and turning through public areas, we chose to keep our public areas open to the outside, blending the exterior to the interior spaces.
During this piece of our Jenga puzzle, we were also required to assemble programming for elevator sizes, furniture, fixtures and equipment for the required additional public spaces we designed.  (gym, manager’s office, mail room, pubic restrooms and laundry).  Below, you will find not only this program, but also our digital presentation.

Author:

Lover of architectural history, family, building design, coffee and dogs.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s